|
|
School
Name |
School
Code |
Opens IN |
Change
Details |
Classification |
Education District |
Year
Levels |
|
|
Ashdale
Secondary
College (previously referred to with planning name
Landsdale
Senior High School) |
4181* |
2009 |
New
School initially
catering for Year 8 but moving to Year 12 (opens 2009) |
|
Swan |
Y08-Y12 |
|
|
Atwell
College |
4184* |
2008 |
New School
Expected to start with Years 7 and 8, incorporating a new campus
called Kim Beazley Learning Community: Atwell
Address: 201 Brenchley Drive, Atwell
Telephone: (08) 9414 4300
Principal: Mr Steven Crake
Steven.Crake@det.wa.edu.au |
|
Fremantle-Peel |
Y07-Y12 |
|
|
Australian
Technical College - Pilbara |
1482 |
2008 |
New Private
School
Pundulmurra Campus - 1 Parker Street, South Hedland
Roebourne Campus -
Fraser Street, Roebourne
Karratha Campus
- Millstream Road, Karratha
Telephone: (08) 91720
1966
Contact: Dr Nancy Rees |
|
Pilbara |
Y11-12 |
i
i |
Bannister
Creek Primary School (previously referred to as
Ferndale
Primary School)
Bannister
Creek
Primary School
(previously referred to with planning name Ferndale/Kinlock/
Lynwood Primary School) |
5817
5817
|
2008
2009
2009 |
Renamed.
Many students from Kinlock PS (5249) and Lynwood PS
(5521), which closed in 2007 have joined this school. Students
are expected to move to the amalgamated and new school, which is
being built on the old Lynwood PS site, in late 2009. This new
school retains the name 'Bannister
Creek Primary School' and has a
new code 5817.
Will close
late in 2009. Students will relocate to the replacement
Bannister Creek Primary School
see
below
in late 2009
Replacement school is expected to open in
late 2009 on the Lynwood PS site.
Principal: Mr Craig Ashby |
TBA |
Fremantle-Peel |
K-Y07 |
|
i |
Blackmore
Primary School |
5544 |
2009 |
Closure
in early 2009 (following amalgamation with Girrawheen PS) see
5576 below. |
TBA |
West Coast |
K-Y07 |
|
|
Bletchley
Park Primary School (previously referred to with planning
name Southern
River Primary
School) |
5808* |
2008 |
New School located on the south east side of Balfour Street, midway
between Furley Road and Barret Street. Will provide relief to
Excelsior PS
Telephone:
9394 0955 (opens 2008)
Principal: Mr Christopher Partington |
TBA (possibly PS Class 4)
|
Canning |
K-Y07 |
|
|
Cape
Naturaliste College
(previously
referred to with planning name
Vasse Middle
School) |
4178* |
2008 |
New School commencing with Year 8 students
Physical Address:
Lot 2 Vass-Yallingup Siding, Vasse 6280
Postal Address:
PO Box 688,
Busselton 6280
Telephone:
9750 2600
Principal: Mr Mark Gillett |
HS Class 6A |
Warren-Blackwood |
Y08-Y10 |
i
i |
Craigie
Heights
Primary School (previously referred to as
Camberwarra
Primary School)
Craigie
Heights
Primary School |
5597
5816* |
2008
2009
2009 |
Renamed.
Many students from Craigie PS (5565), which closed in 2007
have joined this school. Students are expected to move to the
amalgamated and new school, which is being built on the old
Craigie PS site, in late 2009. This new school will retain the
name 'Craigie Heights PS' but will have a
new code 5816*
see
below.
Expected to
close
in late 2009. Students will relocate to the new facilities
(Craigie Heights PS 5816*) which have been completed on the old
Craigie PS site see 5816*
below.
Amalgamated & new school is expected to open late in
2009 on the Craigie PS site.
Principal: Mr Gary Payne |
TBA |
West Coast |
K-Y07 |
|
|
Dalyellup
College (previously referred to with planning names Dalyellup
Secondary College/Dalyellup Middle School) |
4183* |
2009 |
New School
expected to be operational for the start of the 2009 school year
|
TBA |
Bunbury |
Y07-10 |
|
|
Ellen
Stirling
Primary School (previously referred to with planning name
Coolamon
Primary School) |
5805* |
2008 |
New School Strathmore Pathway, Ellenbrook
Principal: Mr Mike Prime |
TBA (possibly PS Class 4)
|
Swan |
K-Y07 |
|
|
Esperance
Anglican Community School |
1481 |
2008 |
New Private
School
Phillips Street, Esperance
Telephone: (08) 9083 2444 |
|
Esperance |
Y08-10 |
|
|
Fitzroy
Crossing
District High School |
4149 |
2009 |
New school buildings
on a different site (retains
existing school code). Expected to be finished in time for the
2009 school year |
DHS |
Kimberley |
K-Y12 |
i
i |
Girrawheen
Primary School
Hudson Park Primary School (previously referred to as
Girrawheen Primary School) |
5576
5819* |
2009
2009 |
Amalgamation
of
Girrawheen PS and Blackmore PS (5544 above) on the Girrawheen PS
site and will be officially known as Hudson Park Primary
School in 2009. Girrawheen will be upgraded and it is expected that the
schools will amalgamate in early 2009. Hudson Park Primary
School (formerly known as Girrawheen PS) will
have a new code
5819*.
Amalgamation of Girrawheen PS (5576) and Blackmore PS (5544) on
the Girrawheen PS site. Opens early 2009. |
TBA |
Swan |
K-Y07 |
i
i |
Greenwood
Primary School (previously referred to as
East Greenwood
Primary School)
Greenwood
Primary School (previously referred to with planning name
Allenswood/East
Greenwood
Primary School) |
5631
5818* |
2008
2009
2009 |
Renamed.
Many students from Allenswood PS (5585), which closed in
2007 have joined this school. Students are expected to move to
the amalgamated and new school which is being built on the old
Allenswood PS site in late 2009. This new school will retain the
name 'Greenwood PS' but will have a
new code 5818*.
Expected to close
in late 2009. Students will relocate to the new facilities
(Greenwood PS 5818*) which have been completed on the old
Allenswood PS site see 5818*
below.
Amalgamated & new school
is expected to open in late 2009 on the Allenswood Primary
School site.
Principal: Mr Ian Herbert |
TBA |
West Coast |
K-Y07 |
|
|
Hocking
Primary School |
5806* |
2008 |
New School Will provide relief to
East Wanneroo PS
Physical Address:
Gungurru
Avenue, Hocking 6065
Principal: Mr Steve Dickson |
TBA (possibly PS Class 4)
|
West Coast |
K-Y07 |
|
i |
Karratha
Senior
College |
4056 |
2009 |
New School on the site
of Pilbara TAFE campus as part of the Karratha Education and
Training Precinct (opens 2009). 4056 will split into two sites
in mid 2009, one on the new site, one on the old.
The same code 4056 will be used for both
sites. 4056
(Karratha SHS) will continue as it is, (with Y8-Y12’s), until
mid 2009 when the upper school ONLY, will go to the new site
(4056, Karratha Senior College). The lower school will remain
(at 4056 site) and “eventually” (possibly 2012?) the lower
school students will join up with the upper school students, on
the 4056 site. |
TBA |
Pilbara |
Y10-Y12 |
|
|
Kim
Beazley
School |
6009 |
2008 |
Will close at
the end of 2008. Secondary students will relocate at the
commencement of Term 2, 2008 to a new campus of Atwell College
(4184*) which will be known as the 'Kim Beazley Learning
Community: Atwell' and primary students will also relocate at
the beginning of 2009 to a new campus of the new primary school
(5813*) in Success currently referred to as 'Success Primary
School (planning name only)'. |
|
Fremantle-Peel |
|
|
|
Kingston
Primary School
(planning name only) |
5810* |
2009 |
New School
to be
constructed in the locality of Australind and will provide
relief to Parkfield PS. The proposed school site is bounded by
Macquarie Dve, Sherwood Rd, Braidwood Dve and Lindfield Rd. The
new school will serve students who reside in the Kingston and
Treendale areas of Australind and in Binningup (opens 2009) |
TBA |
Bunbury |
|
|
i |
Lockridge
Primary School |
5536 |
2009 |
Replacement
school to be
developed on the current Lockridge PS site. It is scheduled for
completion in late 2009. The school will continue to operate on
the site during the construction phase and the school will
retain the same code. |
TBA |
Swan |
K-Y07 |
|
|
Madeley
Primary School
(planning name only) |
5811* |
2009 |
New School
to be constructed in the locality of Madeley (near Landsdale)
and will provide relief to Ashdale PS. The proposed school site
is bounded by Lockeport Approach,
Martindale Ave,
the proposed Olivedale Rd and Amstel Park. The new school will
serve students who reside in the locality of Madeley (opens
2009) |
TBA |
Swan |
|
|
+ |
Manea
Senior
College (previously referred to as Manea
College) |
4179* |
2009 |
New School
(opens 2009) on Bunbury SW TAFE site |
|
|
|
|
i |
Mt Barker
Community College |
4186* |
2008 |
New School
(opens 2008 with new facilities on the SHS site). Stage One
will see the upper primary students (Years 4 to 7), moving to
the new site, to join the secondary students. The former Mt
Barker PS (5318), which closed at the end of 2007, continues as
a campus of the Community College.
Telephone: (08) 9851 3400 |
Community
College Class 6 |
Albany |
K-Y12 |
|
|
Mt Hawthorn
Primary School |
5321 |
2008 |
Amalgamation Mt
Hawthorn Junior Primary and Mt Hawthorn Primary School will
amalgamate at the commencement of the 2008 school year. Address
will be 1 Killarney Street, Mt Hawthorn, 6016. School retains
the same code.
Principal: Mr Dale Mackesey |
PS Class 4 |
West Coast |
K-Y07 |
|
|
Peel Primary
Behaviour Centre |
6143* |
2008 |
New Centre |
|
Fremantle/Peel |
|
|
|
Roseworth
Education Support Centre (previously referred to as Montrose
Education Support Centre) |
6055
|
2008
2009 |
Renamed
and moved to the old Hainsworth PS site. Will then move in late
2009 to new facilities being built on the old Montrose ESC site.
A replacement
school
to be built on
the Hainsworth site. It will retain its code (6055) and is
expected to open in 2009
Principal: Ms Patricia Watt |
TBA |
Swan |
Y01-Y07 |
i
i |
Roseworth
Primary School (previously referred to as
Hainsworth
Primary School)
Roseworth
Primary School
(previously referred to with planning name Montrose/
Hainsworth Primary School) |
5556
5815* |
2008
2009
2009 |
Renamed.
Many students from Montrose PS (5570) which closed in 2007
have joined this school. Students are expected to move to the
amalgamated and new school which is being built on the old
Montrose PS site. This new school will retain the name 'Roseworth
Primary School' but will have a new code
5815*
see below.
Expected to
close
in late 2009.
Students will relocate to the new facilities (Roseworth PS
5815*) which have been completed on the old Montrose PS site
see 5815*
below.
Amalgamation & new school is expected to
open late in 2009 on the Montrose PS site.
Principal: Mr Geoff Metcalf |
TBA |
Swan |
K-Y07 |
|
|
Safety
Bay
Primary School |
5407 |
2009 |
Replacement
school to be
developed on the current Safety Bay PS site. It is scheduled
for completion in late 2009. The school will continue to
operate on the site during the construction phase and the school
will retain the same code. |
TBA |
Fremantle-Peel |
K-Y07 |
|
|
Somerly
Primary School
(planning name only) |
5812* |
2009 |
New School
to be constructed in the locality of Clarkson and will provide
relief to Clarkson PS. The proposed school site is bounded by
Connolly Dve, Somerly Dve,
Orange Grove Blvd
and public open space. It is anticipated that the new school
will serve students who reside in the south eastern half of the
locality of Clarkson (opens 2009) |
TBA |
West Coast |
|
|
|
South
Halls
Head Primary School |
5807* |
2008 |
New School bounded by Karon Vista,
Eulie Court and Merlin Street. Will provide relief to Halls
Head PS
Physical Address:
38 Karon
Vista,
Halls Head 6210
Telephone:
9583 5400
Principal: Ms Jan Workman |
TBA (possibly
PS Class 4) |
Fremantle-Peel |
K-Y07 |
|
|
Success
Primary School
(planning name only) |
5813* |
2009 |
New School
to be constructed in the locality of Success and will provide
relief for both Harmony PS and Jandakot PS. The proposed school
site is bounded by Meridian St, Wentworth Pde, Columbus Loop and
public open space. It is anticipated that the new school will
serve students who reside in the southern part of the locality
of Success (south of
Bartram Rd)
and in the locality of Hammond Park. Will incorporate primary
students relocating from the Kim Beazley School (opens 2009) |
TBA |
Fremantle-Peel |
|
|
|
Tjuntjunjara
Remote Community School |
5814* |
2008 |
New School
Previously a campus of Yintarri Remote Community School. As
from 2008, will be a school in its own right.
Telephone: (08) 9037 1113
Fax: (08) 9037 1106 |
RCS |
Goldfields |
K-Y12 |
|
i |
Waikiki
Primary School |
5781 |
2008 |
New School
buildings on a different site. The new
site is on the south side of Arnside Bend and on the west side
of
Harrington Waters Drive and Kirkbride Meander
(opens 2008)
Principal: Mr Robert Dedman |
PS Class 4 |
Fremantle-Peel |
K-Y07 |